Give us a call: 1-800-831-2278
Lineup of joystick control variations from Sure GripControls

JOYSTICKS

Our joysticks incorporate the newest Hall Effect sensor technology and advanced internal wire configuration. Output options include CAN, Proportional, Switched, USB, and PWM. Single and dual axis spring-return-to-center or friction hold configurations.

Lineup of various machinery handles that are various finishes from Sure Gripcontrols

HANDLES

Sure Grip Control handles are molded from a high impact plastic polymer into comfortable, ergonomic shapes resulting in a rugged and light weight handle for extreme duty applications. Our patented overlay design protects switches from dirt and moisture.

Number of colored modules and components for handles and joysticks

COMPONENTS

Whether you're looking for a slider module, rocker module, or micro joystick, Sure Grip Controls manufactures a wide variety of components with short lead times. Just let us know your specific requirements and we'll be happy to quote!

Black boards and other various electronic to be embedded in Sure Gripcontrols

ELECTRONICS

Sure Grip Controls offers a variety of electronic components such as solenoid drivers, Danfoss adapter boards, ECM interfaces, and more. Call us to inquire about specific driver boards and electronic components.

Why Choose Sure Grip Controls?

Superior joystick and electronic control designs that are reliable, configurable and deliverable.

 

Production line that is used to make Sure Gripcontrols products

Sure Grip Controls is an ISO 9001:2015 certified company employing the latest techniques in lean manufacturing and quality control measures ensuring reliable product.

 

Learn more

Man assembling the faceplate harness Sure Gripcontrols product

Every joystick and electronic control by Sure Grip Controls is highly configurable to your specifications. Give us a call with your requirements. We're ready to earn your business.

 

Learn more

Production line of handles and controls from Sure GripControls

Whether it's one handle or five thousand, our engineering, manufacturing and fulfillment teams are ready to produce your project. Lead times on most projects are three weeks or less!

 

Learn more